610-626-1000

Keystone College Renovation

The Miller Sports team completed an impressive renovation of the Keystone College gymnasium.

  • Date: January 2022
  • Project Type: Gymnasium Renovation

Miller Sports Construction recently wrapped up an extensive project at Keystone College, combining a full sand and refinish of the gymnasium floor with comprehensive equipment installations.

The renovation included refurbishing the gym floor with a meticulous sanding and refinishing process. The sand and refinish job not only revitalized the aesthetics of the floor but also contributed to its longevity and durability. The inclusion of new graphics added a vibrant and personalized touch, creating a visually engaging environment for athletes and spectators.

Additionally, the Miller Sports team installed custom wall pads, bleachers and upgraded lighting fixtures in the gymnasium. A fresh paint scheme was introduced, contributing to the overall aesthetic cohesion of the space. The color palette was thoughtfully chosen to complement the branding of Keystone College, creating a cohesive and visually appealing atmosphere.

The result is a revitalized athletic facility that prioritizes both functionality and aesthetics, providing an engaging and visually pleasing space for Keystone College’s community. Take a look at the transformation before and after photos of the gymnasium below!

Keystone College Gymnasium

Before and After Photos of the Gymnasium

Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring
Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring
Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring
Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring
Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring
Johns Hopkins New Combat Turf
Johns Hopkins New Commercial Flooring