William Tennent High School Renovation
The outdoor track and field facilities at William Tennent High School are complete! The renovation features cutting-edge turf and track systems.
- Date: October 2021
- Project Type: Track and Field Renovation
The recent renovation at William Tennent High School by the Miller Sports team marks a significant enhancement to its athletic facilities. The turf field underwent a comprehensive transformation, providing a state-of-the-art playing surface that meets the highest standards. The installation of the stadium turf involved the removal of the old turf, thorough site preparation, and the installation of a cutting-edge turf system. Simultaneously, the track was given a fresh look with meticulous restriping completed in the summer of 2021. The restriping process involved precision in delineating lanes, ensuring accurate measurements, and utilizing high-quality track paint for durability. The restoration aimed not only to enhance the aesthetics of the track but also to meet industry standards for competition.
Miller Sports Construction takes pride in delivering top-notch projects, ensuring that both the turf field and track not only meet but exceed the expectations of the Centennial School District. These improvements contribute to creating a dynamic and inspiring environment for athletes, reflecting our commitment to excellence in sports construction. View photos of the William Tennent track and turf renovation below!